Develop a work breakdown structure (wbs) and project schedule in a

Develop a Work Breakdown Structure (WBS) and project schedule in a Gantt format for the E-Mail Upgrade Project described in the scenario.The WBS and resultant schedule should contain the following high-level activities:

      1.0 Evaluate User & System Requirements

      2.0 Evaluate ODHS Network Suitability 

      3.0 Conduct E-mail System Selection

      4.0 Upgrade ODHS Network & Hardware

      5.0 Develop E-mail Training

Each of the six WBS elements should be decomposed into two or more activities; additionally, three of these six elements should be decomposed into a third level consisting of at least two more activities. Thus, there should be six high level WBS elements, twelve or more second level activities (two per the six elements), and six third level activities. Use the format described above to define the activities (action verb followed by subject, such as Deploy E-mail System).

The Gantt chart should be developed based on the WBS (all activities should be detailed on the Gantt chart). The Gantt chart should reflect the proper dependencies of each of the activities (for example, you can’t have “Deploy E-mail System” before “Evaluate User Requirements”). For activity duration, provide a reasonable estimate of the time you expect each activity to take; while students are not expected to provide accurate durations, durations should be reasonably defensible and logical. For formatting ease, high level activities should be left justified while second and third level activities should be indented below their parent activities.

Calculate your order
Pages (275 words)
Standard price: $0.00
Client Reviews
4.9
Sitejabber
4.6
Trustpilot
4.8
Our Guarantees
100% Confidentiality
Information about customers is confidential and never disclosed to third parties.
Original Writing
We complete all papers from scratch. You can get a plagiarism report.
Timely Delivery
No missed deadlines – 97% of assignments are completed in time.
Money Back
If you're confident that a writer didn't follow your order details, ask for a refund.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00
Power up Your Academic Success with the
Team of Professionals. We’ve Got Your Back.
Power up Your Study Success with Experts We’ve Got Your Back.